• Nexterra reaches financial close on second biomass plant in the UK

    Nexterra has reached financial close on the its second biomass plant in the UK. Nexterra and its partners participated in the development and financing of the £51.6 m Welland Waste Wood Power Plant loted in Northamptonshire, UK. The Welland project is the second biomass gasifition power plant developed in co-operation with Balfour Beatty Investments, Cogen, MWH Treatment and Nexterra. The project will be operational in 2017.
     › Read more

     

    Boiler arrives at Birmingham
    Bio Power site

    The 140 tonne boiler was delivered at the Birmingham Bio Power site in March. The boiler is a key component of the gasifition plant expected to be commissioned in 2016.
     › Click for more information

     › Subscribe to News

    Nexterra Solutions



    This Nexterra corporate video was prepared by Export Development nada (EDC), an Industry Partner that is assisting the company to respond effectively to international business opportunities.

    Read more...


    Media Coverage


    Energy Boost

    Nexterra’s biomass gasifition systems are using waste biomass to provide heat and power at industrial and institution sites throughout North Ameri and beyond.

    Read this article...

    Read more media coverage...



    亚博体育购彩| 亚博体育取款方式| 亚博体育app苹果版| 亚博体育存款美体中心| 亚博体育app入口| 亚博体育好| 亚博体育链接| 亚博红利| 亚博体育连赢8场| 亚博彩排时长| 亚博体育ios版如何下载| 亚博体育的网址| 亚博体育官网靠得住| 亚博体育赌博靠谱| 亚博体育网赌| 亚博体育和天娱| 亚博体育彩票靠谱| 亚博app苹果版| 亚博体育外围网免费| 亚博体育如何买篮球| 新版亚博体育APP下载| 亚博体育提现问题| 亚博国际APP下载安卓| 亚博反水的钱| 亚博体育支付宝充钱| 亚博体育足球官网| 亚博88官方| 亚博体育app官方下苹果| 亚博APP靠谱| 亚博体育88app| 亚博体育客户端下载| 亚博网站下载| 亚博体育免费| 亚博彩票登录| 亚博体育玩的人多| 亚博内场站票和座位| 亚博体育yabo88| 亚博VIP等级| 亚博体育v2.2.2安卓版| 亚博体育提现| 亚博体育亚博集团免费| http://www.jiudianzhaopin.com/ccczC9HF/ http://www.jiudianzhaopin.com/cccHv7BS/83205.html http://www.jiudianzhaopin.com/ccck9ZGp/ http://www.jiudianzhaopin.com/cccaCCAf/ http://www.jiudianzhaopin.com/cccSyMET/54939.html http://www.jiudianzhaopin.com/cccCeaCw/64718.html